(203) 424-1262 QUOTE LISTReview selected products
FURNIBUILD COMMERCIAL CATALOGProducts, categories and SEO URLs are preservedRequest a Quote

Quick Shipping Usually ships in 1 business day Product Overview Includes (5) 18" x 36" shelves Wire construction provides optimal airflow and allows light to filter through 800 lb. load capacity per shelf Accepts compatible upright posts (sold separately) Quick and easy to assemble UPC Code: 400017531564

Write a review

Note: HTML is not translated!
    Bad           Good

Lavex 18" x 36" Black Z-Beam Wire Shelf for 5-Shelf Boltless Shelving Units

  • Brand: Lavex
  • Product Code: FBR-WS-786e5401f869627d5ed6
  • Availability: In Stock
  • $90


Tags: Lavex, 257B1836Z5WBS